CLEARCUT RESTORATION
 

Field inventory of erosion problems

By 16 April 2015 No Comments
 
 

After a long winter with heavy snow throughout March and April, Richita is difficult to reach by foot. Nevertheless a thorough inventory has been made and we measured almost 3 km of eroded tracks which we proposed to be included into the erosion control measures.